Skip to content

Cixi · Ningbo · south shore of Hangzhou Bay

No longer a labour-cost story.
Now it is who can turn a drawing into a production part.

Smart factories, national design centres, a humanoid-robot training floor, an engineering institute of 18,000 people. Cixi and Qianwan changed how they work. What follows is where that capability actually sits — which chain is upgrading, which number carries a year and a scope, and which claim is only a slogan.

Iron assembly line in Zhouxiang, Cixi: a worker inspecting irons for export
The Zhouxiang iron line: one machine, one operator, a few hundred units a day. Still hands on the line — but every station is paced and inspected.
12
provincial smart factories
2025, first batch, Cixi
¥15.5bn
R&D spend, above-scale firms
2025, Cixi city scope
2
national design centres
Gongniu, Fotile
18,000+
engineers at Geely institute
Qianwan, official figure

On the floor

The workshop changed before the report did.

Three photographs, three stages: people still on the line, machines already on it, and robots learning the next job.

Robot training centre in Cixi: staff training a humanoid robot to sort car parts

Where robots learn the job

Opened in May 2026: a 2,000 sqm training floor with 10 wheeled-arm and 30 bipedal robots, built around real appliance, auto-parts and textile workstations. It produces more than 30,000 hours of real-machine data a year.

Iron assembly line in Zhouxiang, Cixi

Zhouxiang: one line, one person

Irons are this town's core product, counted in tens of millions a year. It still looks like a lot of hands — but every station is paced and inspected. That is the base layer of smart manufacturing, not its opposite.

Robot inspection equipment at a Cixi auto-parts plant

Inspection handed to machines

Auto parts is an old Cixi trade, now running robot inspection cells: stable cycle time and traceable data. That is what keeps a plant on a tier-one supplier list.

Evidence

“Smart” is a list and a budget, not a slogan.

Every line below traces to a published list or a batch number. Claims without a document are left out.

Smart factories

12 plants in the first 2025 batch of Zhejiang's advanced smart factories, including Gongniu, Jianan Intelligent, Fuerda and Fotile.

Industrial design

Two national industrial design centres (Gongniu, Fotile); the provincial list includes Pioneer, Hanged, Yueli, SanA, Zhuoli, Xinhai, Baogong, Deye and Jiale.

R&D

¥15.53bn of R&D spending by above-scale firms in 2025; appliances alone spent ¥3.4bn, 40.3% of the city's above-scale total.

Auto & robotics

Qianwan's auto output exceeds ¥130bn and supplies over 60% of Ningbo's assembled vehicles; Geely's research institute has more than 18,000 engineers; CATARC Zhejiang has opened.

What is made here

Six clusters, six different ways to buy.

Each has its own MOQ norms, its own quality risks and its own definition of “normal.” Knowing which one you are in prevents most sourcing mistakes.

Two libraries

Pin the category first, then check the name on record.

One library says what has to be nailed down before you ask for a price. The other says which companies have been named in a document — and which have not.

Why this exists

A directory tells you who exists. That is not the problem.

The real problem is specification

Two quotes for the same part number can be 40% apart because the motor, the plastic or the tolerance class changed. We write down what to pin in the PO.

Then it is verification

Certificates are easy to photograph and hard to check. We say where to look, what to measure, and which claims you cannot verify from an email.

Then it is the first order

Sample, trial order, container. The sequence is boring and it is the only thing that reliably separates a good supplier from a cheap one.

Optional, paid per job

See the factory before you wire the deposit.

The directory and the shortlists are free. What you can order is our legs, eyes and camera: video audits, on-site visits, live-streamed tours you direct. Fixed quote before work starts, no commission — and the report answers to you only.

Audit & inspection services →
  • Remote video factory audit

    US$180–320 per factory, fixed quote before we start

  • On-site visit & photo report

    US$480–900 per factory per day (Cixi and greater Ningbo), fixed quote before we start

  • Live-streamed factory tour

    US$260–450 per half-day, fixed quote before we start

  • Sample consolidation & shipping

    US$150 service fee + actual courier cost, fixed quote before we start

  • Negotiation & translation support

    US$40–60 per hour or US$280–400 per day, fixed quote before we start

  • Full details & booking →

Tell us what you are trying to build.

If it fits this belt, we say which cluster to look at, what the honest MOQ is and which questions to ask before a deposit. If it does not fit, we say that too.