Glossary
The trade terms this belt will throw at you
Definitions for the terms that decide money and risk when buying from Cixi & Ningbo factories — what each one actually changes for you, not just what the acronym stands for.
Price & payment
- MOQ起订量(最小起订量)
- Minimum order quantity — the smallest batch a factory will run profitably. It is driven by setup time, material minimums and packaging, not by the factory's mood: the same cluster can quote very different MOQs for different configurations of one product.How to negotiate MOQ →Cluster MOQ ranges →
- FOB船上交货价(离岸价)
- Free On Board (a named port, e.g. FOB Ningbo) — the seller covers costs and risk until the goods are loaded on the vessel; the buyer owns freight, insurance and everything after. It is the most common quoting basis in this belt and the cleanest one for comparing factories.FOB Ningbo vs EXW Cixi →
- EXW出厂价(工厂交货)
- Ex Works — the buyer picks the goods up at the factory gate and arranges everything: trucking, customs, freight. Quotes look cheaper than FOB but shift real work and cost onto the buyer; compare quotes only on the same basis.FOB Ningbo vs EXW Cixi →
- CIF到岸价(成本+保险+运费)
- Cost, Insurance and Freight (a named destination port) — the seller arranges and pays for freight and minimum insurance to that port; risk still transfers when the goods are loaded, not on arrival. Common for smaller buyers who want one landed price.
- T/T电汇(银行转账)
- Telegraphic Transfer — a direct bank transfer, typically quoted as a deposit balance split (commonly 30/70: deposit before production, balance before shipment or against the B/L copy). Deposits are normal; full prepayment to an unverified factory is where buyers get burned.
- L/C信用证
- Letter of Credit — the buyer's bank promises payment against shipping documents that match the credit exactly. Safer for both sides on large orders, but strict: a typo in a document can hold up payment, and small factories in this belt often resist L/C terms.
- Tooling / mold fee模具费(开模费)
- The one-off cost of building the mold or fixture a custom product needs. Always ask who owns the tool: if you pay for it, the factory should not freely run your mold for other buyers, and moving production elsewhere should be negotiable.
Production & samples
- OEM代工生产(按你的设计)
- Original Equipment Manufacturer — the factory produces to your drawings, branding and specifications. Most factories in the Cixi belt are OEM-capable; the real question is whether their process control holds your tolerances, not whether the word appears on their website.
- ODM贴牌(用厂方现成设计)
- Original Design Manufacturer — the factory sells you its existing design with your brand on it. Faster and cheaper than OEM, but the same catalog is usually quoted to several buyers, so differentiation is limited.
- BOM物料清单
- Bill of Materials — the exact list of parts, materials and specifications that define one configuration of your product. Price on a pinned BOM, never on a photo: a quote without a BOM lets the factory quietly substitute cheaper components later.
- First article inspection (FAI)首件检验
- A full measurement and review of the first piece off a new production run or mold, before mass production continues. Asking for a FAI on new tooling catches dimensional problems at the cheapest possible moment.
- Golden sample封样(标准样)
- A sealed reference sample, signed or stamped by both sides, that defines the quality target for the order. Without one, disputes drift toward whatever is convenient for the factory; with one, you point at the seal.
Quality & inspection
- AQL抽检可接受质量限
- Acceptable Quality Limit — the defect rate a sampling plan tolerates (e.g. AQL 1.0 for major defects is a common consumer-goods line). Agree the AQL level and the sampling standard in writing before production, not after the goods are ready.Pre-shipment inspection checklist →
- PSI出货前验货
- Pre-Shipment Inspection — an on-site check when the order is packed and ≥80–100% produced: sampling against the golden sample, AQL plan, carton drop tests and label review. It is the last cheap chance to reject a batch before money and goods move.Pre-shipment inspection checklist →
Shipping & documents
- HS code海关编码
- The Harmonized System commodity code that decides your import duty and export rebate. Different codes for materially different configurations — ask the factory which code they declare, then verify it against your country's tariff schedule.
- Certificate of origin (C/O)原产地证
- A document certifying where goods were made; preferential forms (e.g. Form E for ASEAN–China) can cut your import duty significantly. It is issued via trade channels, not by the factory itself — treat a factory promising 'any certificate you like' as a red flag.
- LCL / FCL拼箱 / 整柜
- Less than Container Load (your goods share a container) versus Full Container Load. Small trial orders ship LCL at a higher per-unit freight; once volume fills most of a container, FCL usually beats it on both cost and damage risk.
Told you the terms, now pick the factory
Tell us the part, the volume and the destination market — we point you at verified factories that match, free, no commission.
Send an inquiry