Start here · Qianwan New Area · Cixi
Sourcing robotics & precision parts from Cixi — where to start, what it costs, what to ask
The short version for a first conversation with factories in this cluster: realistic order sizes, where prices land, how long production takes, and the questions that catch problems before your deposit moves. The full picture lives on the Robotics industry page.
The three numbers to walk in with
This cluster is built for low-volume, high-mix work: 10–100 piece prototypes are routine; 500–5,000 piece bridge orders are common. High-volume production runs once the design is locked. Do not come here expecting commodity-priced million-piece orders.
Prototype and bridge parts price in setup, machining time and metrology, not in piece weight. Expect to pay for fast iteration — a shop that can turn a drawing in 48 hours is worth several times the cheapest CNC jobber. High-volume post-lock pricing falls sharply.
Prototype parts: 5–10 days for CNC machined aluminium. First bridge batch: 2–4 weeks including inspection. Design iteration is compressed — a good shop turns revisions in days, not weeks.
These are practitioner ranges for negotiation, not quotes. Every factory prices its own BOM — use them to spot quotes that are off, not to set them.
What this cluster can make for you
- Precision CNC-machined aluminium and steel parts for robot structures
- Actuator housings, gearbox and reducer components
- Motor shafts, end bells and magnetic-component hardware
- Sensor brackets, perception mounts and small structural brackets
- Dexterous-hand hardware: tiny precision parts, flexures, custom springs
- Small-batch injection-moulded and over-moulded parts for robotics
Five questions to ask before you pay a deposit
01What exactly is included in this price?
Get the BOM pinned: motor class, module, sensor suite, material grade, finish. Two quotes on a same-looking product can differ 2–3x on these choices alone — pin the spec, not the picture.
02What is the MOQ for my configuration, not your catalogue model?
Catalogue MOQ and custom MOQ are different numbers. Ask for the MOQ of your exact spec, in writing, with tooling and NPI fees separated from unit price.
03Which certifications are actually held — and what is the certificate number?
A copy in a quote folder is not proof. Ask for certificate numbers you can verify, and be clear about which certifications apply to your destination market.
04What is the inspection plan before shipment?
Agree what gets checked, at what stage, against what standard — before the deposit, not after production. Bring your own inspector if the product risk justifies it.
05What happens when a batch fails QC?
Ask the rework / replace / refund question early. A factory that has a clear answer has thought about quality before; one that only says 'no worry' has not.
Where this cluster goes wrong
- 01CMM report on every precision dimension — do not accept visual
- 02Material cert matches the alloy (7075 vs 6061 is not interchangeable)
- 03Surface finish and deburring on moving or mated parts
Robotics sourcing — quick answers
What MOQ should I expect for robotics?
This cluster is built for low-volume, high-mix work: 10–100 piece prototypes are routine; 500–5,000 piece bridge orders are common. High-volume production runs once the design is locked. Do not come here expecting commodity-priced million-piece orders.
What price band do robotics factories here work in?
Prototype and bridge parts price in setup, machining time and metrology, not in piece weight. Expect to pay for fast iteration — a shop that can turn a drawing in 48 hours is worth several times the cheapest CNC jobber. High-volume post-lock pricing falls sharply.
How long is the typical lead time?
Prototype parts: 5–10 days for CNC machined aluminium. First bridge batch: 2–4 weeks including inspection. Design iteration is compressed — a good shop turns revisions in days, not weeks.
Which certifications do factories in this cluster usually hold?
ISO 9001 (common), CMM / FAI inspection reports per batch, Material certs for aluminium, stainless, titanium where specified, Clean-room packing for optical / sensor parts on request. A certificate copy inside a quote folder is not proof — ask for the certificate number and verify it.
Where does this cluster most often go wrong?
CMM report on every precision dimension — do not accept visual Material cert matches the alloy (7075 vs 6061 is not interchangeable) Surface finish and deburring on moving or mated parts Traceability: batch number on the part and the packing list Flatness and perpendicularity on mounting faces, not just dimensions Packing: ESD / anti-oxidation for precision machined parts