Skip to content
Home/Town map/Urban core

Zonghan

An old industrial park converted into a small smart-manufacturing cluster.

Assembly equipmentPolishing robotsMotorsInspection systems

Zonghan is what a rebuilt industrial park looks like. Over three years the Chaotang park cleared or merged 387 low-grade firms and recovered 420 mu of land; the first phase of the Chaotang workshop park brought in six high-end manufacturing and manufacturing-service firms in four months, with expected annual output of RMB 400m.

How the town is structured

Equipment makers, robot integrators, motor suppliers and inspection services share converted multi-storey buildings. Units are small and leases flexible, which suits project work but not heavy processes.

What to check on a factory visit

Operator experience and negotiation starting points — not statistics.

  • Separate the robot maker from the integrator from the process-service shop — whether grippers, fixturing and commissioning are in the quote changes everything
  • For polishing, insist on a trial with your own workpiece; force-control stability and consumable cost decide the deal, not the datasheet
  • Check floor height, floor loading and power — injection and stamping will not fit a multi-storey converted building

Verified figures

  • •Chaotang workshop park: 6 firms in 4 months, expected annual output RMB 400m
  • •Three-year clean-up: 387 low-grade firms closed or merged, 420 mu of land recovered, 5 new national 'little giant' firms

Next towns on the same chain

Common questions about sourcing in this town

What does Zonghan make?

The town's industrial profile on this site lists: Assembly equipment, Polishing robots, Motors, Inspection systems. Company-level detail lives in the directory once factories there pass the on-the-ground checks.

What should I check before visiting a factory in Zonghan?

Separate the robot maker from the integrator from the process-service shop — whether grippers, fixturing and commissioning are in the quote changes everything For polishing, insist on a trial with your own workpiece; force-control stability and consumable cost decide the deal, not the datasheet

Where do the figures about Zonghan come from?

From Cixi statistical bulletins, government work reports and provincial/municipal economy bureaus, each cited on the sources page with year and scope. Practitioner notes on this page are experience-based starting points, not statistics.

How do I get introduced to factories in Zonghan?

Send an inquiry with the part, the volume and the target market. We match it against verified factories — by town and product category — and route it to the ones that fit. Asking costs nothing, and we take no commission.